Stone Pre-Installation Checklist for Fabrication Drawings
A sink cutout with an unconfirmed model can hold up an entire fabrication drawing. Use this checklist to identify who owns each pending decision and which revision everyone should work from.

Find gaps before releasing the drawing
Confirm that the cabinet drawing, stone layout and appliance template carry compatible revisions. If a sink has moved on the cabinet drawing, mark the stone cutout as pending until the designer or installer confirms the change. Record the approver and date.
Review the stone within the assembly
Review the substrate, connections and fittings as an assembly. Confirm the appliance model, manufacturer template, orientation, seam locations and which edges remain exposed. The BCA guide describes the assembly and the public ASTM scope discusses compatibility. Use the project documents for acceptance tolerances and assembly requirements.
Check inputs by application
For worktops, coordinate cabinetry and appliances. For wall panels, establish substrate and attachment details. For stairs, confirm tread and nosing geometry with the responsible designer. Record the applicable detail for each location.
Assign approvals and handover duties
The designer or installer confirms site dimensions, support and the installation approach. The fabricator checks the specified parts against the approved drawing. Assign the delivery route, unloading and receipt to named parties under the agreed scope.
Release one approved drawing in five steps
- Gather cabinet or substrate drawings, the stone layout, fixture data and finish requirements.
- Mark unresolved cutouts, dimensions and joints as pending.
- Have the responsible designer or installer compare the documents.
- Record the final revision, approver, vein direction, finish and edge profiles.
- Confirm piece count, package labels and receiving contact.

Check the delivery against the approved documents
| Check | Evidence | Responsible party |
|---|---|---|
| Part size | Approved revision | Dimension approver and fabricator |
| Cutouts and orientation | Approved template | Designer or installer, with fabrication cross-check |
| Seams and vein direction | Slab layout | Layout approver |
| Edge and finish | Approved specification | Fabricator and recipient |
| Support and attachment | Assembly documents | Project specialist |
| Packages and receiving point | Delivery list | Agreed handover parties |
Prepare a clear fabrication enquiry
Send the approved dimensioned drawing, stone code, edge profile, finish and cutout or slab layout. Flag provisional items in the enquiry. Record delivery responsibilities separately so the fabricator can assess the same inputs when comparing options.
Questions before approving the stone specification
Keep unanswered items pending until the responsible approver records the decision.
Can a concept drawing supply final dimensions?
Use it for discussion. Release cutting dimensions only after the person responsible for them approves the drawing.
What if the sink model is still pending?
Hold the cutout until the model and matching template are approved.
Is doorway width enough to confirm delivery access?
Check the full route, package size and unloading arrangements with the receiving party.
Do all parts arriving confirm the substrate is ready?
Record receipt against the delivery list. The project specialist checks cabinet, substrate and structural readiness separately.
Assemble the final drawing package
Use a single approved revision to request fabrication. Ask the designer or installer to confirm the substrate, connections and support and ask the receiving party to confirm access and handling.